City of Crookston to have infrastructure improvement on Locken Blvd. and Memorial Drive beginning October 6

The City of Crookston is announcing an upcoming infrastructure improvement project scheduled to begin on Monday, October 6, 2025, in the neighborhood near Lift Station 5, located at the corner of Memorial Drive and Locken Boulevard.

This project will replace and upsize the existing force main, improving the lift station’s overall efficiency and helping reduce the risk of localized sewer backups into residential homes during heavy stormwater events.

Construction Information:

  • Start Date: October 6, 2025 (weather permitting)
  • Duration: Approximately one week
  • Traffic Impacts: Locken Boulevard will remain open to local traffic only during construction. While some minor disruptions may occur, overall impacts are expected to be limited.

This project is essential in strengthening the wastewater infrastructure and protecting nearby homes.

Residents with questions or concerns are encouraged to contact:
Chuck Getsman
(218) 281-1232
Cgetsman@crookston.mn.us

Leave a Reply

Your email address will not be published. Required fields are marked *